Skip navigation

407.327.6000

Proudly Serving Central Florida Since 1975

Quality, Performance and Value Are Our Commitment to You!

Our Projects

Florida Hospital Sanford Burnham Translational Research Institute for Metabolism and Diabetes

Florida_Hospital_Sanford_Burnham_Translational_Research_Institute_for_Metabolism_and_Diabetes

In total 10 different plumbing systems were installed utilizing 10,000 man hours and zero accidents.

Read Full Case Study

Vaccine and Gene Therapy Institute of Florida

Alt for Vaccine_and_Gene_Therapy_Institute_of_Florida_portfolio11

In total, Modern Plumbing installed 10 different plumbing and gas systems that took nearly 1000 hours of coordination and 3D BIM modeling and 20,000 man hours for installation.

Read Full Case Study

UCF Solar Panels, Tower 2

Alt for UCF_Solar_Panels_Tower_2_portfolio10

The University has been going green for some time. The Tower 2 dormitory houses 500+ students and consumes massive amounts of water daily. Modern Plumbing Industries (MPI), in coordination with the school, installed a solar water heating system to help satisfy demand and reduce expenses associated with water heating.

Read Full Case Study

UCF Knights Plaza

Alt for UCF_Knights_Plaza_portfolio9_1

This design-assist project required a keen relationship with the general contractor and owner/developer in order to bring the projects in under budget. A complete team effort with all trades allowed the construction crew to meet a fast paced schedule that was driven by an even greater demand for on-campus housing.

Read Full Case Study

UCF Burnett School of Biomedical Sciences

Alt for UCF_Burnett_School_of_Biomedical_Sciences_portfolio8

The 198,000 sq. ft. research facility was the first to begin construction at the new Lake Nona Campus. In addition to the goal of attaining LEED Silver, the building houses state-of-the-art laboratories and a vivarium with an extremely controlled environment.

Read Full Case Study

Pointe Orlando Redevelopment

Alt for Pointe_Orlando_Redevelopment_portfolio7

This retail center, that features some of the best shopping and eating Orlando has to offer, is located at a large tourist area on International Drive.

Read Full Case Study

Orlando Lutheran Towers Assisted Living Facility Residential Tower

Alt for Orlando_Lutheran_Towers_Assisted_Living_Facility_Residential_Tower_portfolio6

Modern Plumbing Industries (MPI) worked closely with the general contractor and the owner on this design-assist project.

Read Full Case Study

JetBlue & Live TV Hangar Facility

Alt for JetBlue__portfolio5

The facility is a 100,000+ sq. ft. airplane hangar used by JetBlue to retrofit planes, up to three at a time, with seat mounted televisions.

Read Full Case Study

Project Rumble (Hollywood Rip, Ride, Rockit)

Alt for Project_Rumble_Hollywood_Rip_Ride_Rockit__portfolio4_1

The newest of Universal Studios’ roller coasters began construction in 2008. The accelerated schedule and on-site logistics created challenges during each phase. Many of the existing utilities underground had to be relocated due to the support structure needed for the new ride.

Read Full Case Study

Florida Hospital Altamonte Surgery Expansion

Alt for Florida_Hospital_Altamonte_Surgery_Expansion_portfolio3

Expanding this surgical center was both challenging and rewarding for the project team. The challenges of building a project of this type included: very limited on site storage for materials, a fast track schedule that would not disrupt the everyday operations of the hospital and a requirement for double shifts.

Read Full Case Study

Embry Riddle University Solar Panel Installation

Alt for Embry_Riddle_University_Solar_Panel_Installation_portfolio2

The Embry Riddle University Solar Panel Installation Project was performed in conjunction with the replacement of the high roof on the John Paul Riddle Student Center in Daytona Beach Florida.

Read Full Case Study

Hyatt Regency Grand Cypress – Guestroom Renovation

Alt for Hyatt_Regency_Grand_Cypress_Guestroom_Renovation_portfolio1

The award-winning hotel underwent a complete renovation to all of 820 guestrooms and suites. All of the rooms were smartly-designed with high-end plumbing fixtures and trim.

Read Full Case Study