-
Plumbing
-
Drain and Sewer
-
Water Heaters
-
Water Treatment Systems
-
Commercial Plumbing Services
- Commercial Plumbing Installation
- Commercial Plumbing Repair
- Commercial Jetting
- Commercial Drain Cleaning
- Commercial Gas Piping
- Commercial Backflow Testing and Prevention
- Commercial Video-Camera Inspection
- Commercial Water Heater Services
- Commercial Booster Pump Repair
- Commercial Booster Pump Replacement
- Commercial Sump Pumps
- Commercial Water Treatment Systems
- Commercial Re-Piping
- Commercial Pipe Installation
- Commercial Plumbing Maintenance Contracts
-
Commercial Construction Plumbing
- Financing
-
The Modern Way

The newest of Universal Studiosâ roller coasters began construction in 2008. The accelerated schedule and on-site logistics created challenges during each phase. Many of the existing utilities underground had to be relocated due to the support structure needed for the new ride. Our team analyzed these areas to make sure the relocation of the utilities would not affect the park in any way. Modern Plumbing Industries and the construction team finished the project on time and within budget.
Highlights:

- Installed a 3â compressed air loop that controls the brake system for the ride
- Relocated 6â gas main
- Relocated a 6â potable water ductile main
- Relocated a 4â irrigation main